University of Minnesota
Mondale Hall |
|
Project Overview |
This project consists of updating lighting over the book stacks in the Law Library at Mondale Hall, located at 229 - 19th Avenue South, Minneapolis campus in accordance with the following objectives:
- Item #1: Install new electrical wiring from existing floor power outlets to book stack lighting fixtures and timer controlled switches.
- Item #2: Replace existing T12 lamps with energy efficient lamps and ballast. It is our intention to have an increased lighting level over existing conditions. Existing light fixtures are not bright enough.
- Item #3: Replace existing 3-way light switches and timer control circuits.
|
| Schedule |
No |
|
End Date |
|
Task |
1 |
|
12/05/06 |
|
Educational Meeting & Site Walk |
2 |
|
12/13/06 |
|
Submittals Due
|
3 |
|
12/18/06 |
|
UMN Identifies Best Value |
4 |
|
12/18/06 |
|
Pre-Award Kick Off Meeting |
5 |
|
12/21/06 |
|
Pre-Award Meeting |
6 |
|
12/27/06 |
|
Anticipated Date of Award |
|
| Bidding / Proposal Information |
All information is removed once bids are submitted. To obtain this information, please contact the client or the PBSRG. |
|
Award Information |
Vendor Name: |
|
Gephart Electric |
Estimated Budget: |
|
$160,000 |
Awarded Cost: |
|
$143,325 |
Awarded Schedule: |
|
133 days |
Scope of Work: |
|
Updating lighting over the book stacks |
For detailed award information, click here ( XLS). (This excel spreadsheet provides a summary of all the data that was collected. It is available only to pre-approved vendors). Please contact the PBSRG for the username and password.)
For a complete list of all project risks, click here ( DOC). (This document contains a list of all the risks that were identified by the vendors on this project. No solutions are identified, just a list of risks). This file is available to only pre-approved vendors. Please contact the PBSRG for the username and password. |
|
Closeout Status |
Vendor met proposed schedule: |
|
Yes |
Vendor met proposed cost: |
|
Yes |
Vendor met purposed quality/customer satisfaction: |
|
Yes |
Final customer rating of PIPS (10 max): |
|
10 |
| Final rating of contractor (10 max): |
|
10 |
|
|