University of Minnesota
Jackson Hall Remodel 4-164 |
|
Project Overview |
The following are focal points for this remodel:
- Removal of existing furniture/shelving not required for use by Neuroscience department
- Removal of existing carpet & base within room 4-164
- New dedicated 20AMP/110-120V power circuits for each of owner-provided hoods/freezers/incubators/etc.
- Installation of new 36” wide passageway between rooms 4-160 & 4-164
- Installation of new sheet vinyl & base to match existing in room 4-160
- Upsizing of existing air supply duct feeding Room 4-164
- Decommissioning of existing air return duct in Room 4-164, ductwork to remain, removal of grille and replacement w/metal cover plate
- Replacement of existing VAV S4-24 to handle increased airflow of 800cfm to Room 4-164
- Replacement of existing air diffusers
- Modification of existing radiation control in Room 4-164, programmed to remain off when cooling is required in room
- Provision & installation of new air return duct & diffuser w/new volume control damper within Room 4-160, tied into existing return duct above Room 4-160A
- Cleaning of all diffusers within Room 4-160 & 4-164
|
|
Award Information |
Vendor Name: |
|
Award Construction |
Estimated Budget: |
|
$45,000 |
Awarded Cost: |
|
$31,831 |
Awarded Duration: |
|
40 days |
Scope of Work: |
|
Remodeling Jackson Hall room 4-164 |
For detailed award information, click here ( XLS). (This excel spreadsheet provides a summary of all the data that was collected. It is available only to pre-approved vendors). Please contact the PBSRG for the username and password.)
For a complete list of all project risks, click here ( DOC). (This document contains a list of all the risks that were identified by the vendors on this project. No solutions are identified, just a list of risks). This file is available to only pre-approved vendors. Please contact the PBSRG for the username and password. |
|
|
|
 |