City of Peoria, AZ
Various Water Line Design Services |
|
Project Overview |
The City of Peoria’s Water Capital Improvement Program includes projects to extend and/or upgrade the existing water distribution system. Four (4) separate water distribution lines have been identified as individual projects. A separate scope-of-services for each of these pipelines is identified below and the city may award any number of the projects to a single consultant.
PROJECT LIST
16-inch Water line Pinnacle Peak Road / 73rd Avenue to 83rd Avenue
(UT00198) FY2005 - Design $ 99,000, Construction $ 660,000
24-inch Water line 91st Avenue / Beardsley Road to Union Hills
(UT00096) FY2005 - Design only $110,000
24-inch Water line Beardsley Road / Lake Pleasant Road to 87th Avenue
(UT00145) FY2006 – Design only $220,000 FY06
8-inch Water line Hatcher Road / 75th Avenue to 77th Avenue
(UT00098) FY2005 - Design only $40,000
|
Bidding / Proposal Information |
All information is removed once bids are submitted. To obtain this information, please contact the client or the PBSRG. |
|
Award Information |
Vendor Name: |
|
3 Awards (Wood Patel / Entellus / Brooks) |
Awarded Cost: |
|
$1,300,000 |
|
|
Closeout Status |
Vendor met proposed schedule: |
|
Awaiting Results |
Vendor met proposed cost: |
|
Awaiting Results |
Vendor met purposed quality/customer satisfaction: |
|
Awaiting Results |
Final customer rating of PIPS (10 max): |
|
Awaiting Results |
| Final rating of contractor (10 max): |
|
Awaiting Results |
|
|